Projection Welding Robotic Working Cell – L Series 2

Part:                Gearshift and handbrake mounting plate
Material :               Galvanized sheet
Process :          Projection welding

Benefits of Projection Welding Robotic Working Cell – L Series 2

  • 10 minutes’ Program Set Up
  • 8 hours’ Mastering/Operating/Maintaining
  • Highly Standardized Components
  • Modular Design
  • Compatible with > 64 Fixtures
  • Intelligent Data Analytics Software Service

  • 1. 2D Camera
  • 2. Robot
  • 3. Feeder
  • 4. Material discharge conveyor line
  • 5. Projection welder
  • 6. 3D Camera
  • 7. Control cabinet
  • 8. Robotic gripper
  • 9. HMI
  • 10.Chiller
  • 11. Security fence
  • 12. Feeding conveyor line
  • 13. Gripper bracket

Application

                     

Specification: Projection Welding Robotic Working Cell – L Series 2

Weldable Thermoformed sheet, galvanized sheet
Equipment color ±0.05~±0.5mm
Out-of-process Time 5s
Flexible Manufacturing  Multi-Model Series Production
Installation Method  Common Base Floor
Hardware  Robot*1, Robotic Grippers*6, 2D Camera*1,  Projection Welder*2, Infeed Port *1, Outfeed Port*1
Software  Standard electrical drawings; Standard PLC recipe programme
Floor Space  7.1*6.8 ㎡

Get in touch with us

Whether you are looking for a quotation or partnership support, we are happy to assist you.

Scroll to Top
Free Quote & Information Request