Home Applicances
Customer
Microwave Oven Manufacturer
Challenge:
The welding beat of the old process used by the customer was slow and could not reach the required 3.5S/piece.The surface of the material was blackened after welding by the old process and required secondary treatment.This made production inefficient and costly.
To solve this problem, we use the energy storage welder to realize fast discharge, improve the beat and at the same time ensure that the surface does not change color when welding.
CDW Automated Welding Line|
Materials:galvanized sheet/Stainless steel plate
Cabinet
Persona de contacto: Cristina Liu
Tel: 86 20 87813325 / 86 20 87819588 / 86 20 87815075
Fax: 86 20 87813346
Dirección: No.63 Xin Yi Road, ciudad de Taiping, distrito de Conghua, Guangzhou, China
Persona de contacto: Cristina Liu
Tel: 86 20 87813325 / 86 20 87819588 / 86 20 87815075
Fax: 86 20 87813346
Dirección: No.63 Xin Yi Road, Guangzhou, Guangdong China 510990